Replacement, installation only
You've chosen the products. We do the rest.
FromAbout 7 working days
- Strip-out and waste removal
- Plumbing and tested electrics
- Shower walls tanked and tiled
- Your products fitted and tested
En-suites · London
Whether you're replacing a tired en-suite or creating a new one from a box room, a deep cupboard or the loft, the hard part is the bit nobody sees: getting the waste to the soil stack, and the steam out of a small room before it reaches the bedroom.
New and replacement en-suitesBuilding regulations checked12-month guarantee
Two kinds of en-suite job
They sound similar, but they're very different projects. Knowing which one you have tells you how we'll price it.
The drainage, water and power are already there. We strip the room back, fix what's behind the walls and fit everything new, often in the same layout.
Typical programme: about 7 working days.
Pricing: a guide price from your photos, confirmed at the survey.
A new room needs a waste route, water supplies, power, a stud wall or two, and ventilation that meets building regulations.
Typical programme: longer, depending on partitions and drainage.
Pricing: always quoted after a survey, because the drainage route decides the cost.
Planning a new en-suite
The best spot for an en-suite isn't always the one that looks most obvious on a floor plan. It's the one where the plumbing works.
At the survey we trace the soil stack, lift a board to see which way the joists run, and look at where an extractor duct can get outside. Then we tell you plainly whether your chosen space works, what it would take, and whether a nearby alternative would save you money.
If you're adding an en-suite in a leasehold flat, check your lease early: moving or adding a bathroom usually needs the freeholder's consent.
Making a small room work
Most en-suites are small, so we plan around fittings that save floor space without feeling cramped.
How it works
A replacement en-suite runs like any bathroom. A new one adds design and paperwork at the start, which we take care of.
Photos of the room, the bathroom nearest to it and, if you can, the loft or ceiling above.
About 5 minutesA guide price for a replacement, or a realistic range for a new en-suite.
Within 48 hoursStack, joists, duct route and power checked, and the layout sketched with you.
£100, refunded on orderDrawings, the building regulations that apply, and a fixed written price.
2–3 days after surveyWalls, plumbing and electrics, then tanking, tiling and fitting, with certificates at handover.
From about 7 working daysPrices
Guide prices. Replacements can be priced from photos. New en-suites depend on the drainage route, so we confirm them after a survey.
You've chosen the products. We do the rest.
FromAbout 7 working days
Products, tiles and fitting under one fixed price.
From approximatelyAbout 7 working days
From a box room, cupboard or loft space.
PricedDepends on drainage, partitions and ventilation
For a figure based on your own measurements, try the bathroom cost calculator. Renovating the main bathroom at the same time? See bathroom renovation.
Quality
So a slow leak, a damp wall or a rattling fan matters more here than anywhere else in the house.
Questions
Not sure your space will work? Send us a few photos and we'll give you an honest first view.
Usually, yes. A new en-suite normally involves new drainage, mechanical ventilation and electrical work near water, which are covered by building regulations. We tell you exactly what applies at the survey and arrange the notifications and certificates. Replacing an existing en-suite like for like rarely needs an application.
Not always easily. The biggest limit is the distance to the soil stack and the direction of the floor joists. Rooms next to or above an existing bathroom are usually simplest. We check the route at the survey and suggest the most practical spot if your first choice is difficult.
Only when gravity drainage really isn't possible. Building regulations accept a macerator only where the home also has a toilet that drains by gravity, and they're noisier and need occasional servicing. We'll always look for a gravity route first.
Replacing an en-suite with products supplied starts from approximately £9,500, or from £6,200 if you supply the products. New en-suites are priced after a survey, because the drainage route, partitions and ventilation vary so much from house to house.
A replacement en-suite usually takes about 7 working days. A new en-suite takes longer, as new walls, drainage and ductwork come first. Your programme sets out each day before we start.
We insulate the stud walls, fit a quiet extractor that keeps running after you leave, and leave a gap under the door so air can flow. Soft-close seats and drawers help too. It's the combination that keeps the bedroom quiet and dry.
Areas we cover
Loft en-suites in Victorian terraces, box-room conversions in semis, and replacement en-suites in mansion flats.
Further reading
Get your estimate
Send photos of the space and the nearest bathroom. We'll tell you whether the drainage works and give you an initial estimate within 48 hours.
Get your estimate